This project is Work Package #3 of the Doe Branch Water Reclamation Plant Phase 3 Expansion, increasing the plant’s treatment capacity from 4 to 12 MGD in collaboration with the CMAR, Archer Western. The project consists of the construction of a 5.5 MG Aeration Basin, (2) 135’ diameter Secondary Clarifiers, and a Splitter Structure.