This project is Work Package #5 of the Doe Branch Water Reclamation Plant Phase 3 Expansion, increasing the plant’s treatment capacity from 4 to 12 MGD in collaboration with the CMAR, Archer Western. The project consists of the construction of a new UV/Filter Structure with a dedicated Electrical Building, a new Effluent Box, an addition to the existing Dewatering Building, a new Dewatering Electrical Building, and a new Odor Control System. Project equipment includes (2) UV Channels, (3) Cloth Media Filters, (1) Aeration Blower, (3) NPW Pumps, (1) Carbon Odor Control unit, (1) Dewatering Centrifuge, relocation of (1) existing Centrifuge, (2) Sludge Pumps, Polymer Blending Units, and Alum Pumps. The project also includes excavation, yard piping, mechanical piping, drilled piers, and equipment startup.