This project consisted of the installation of 1,305 LF of 96” steel pipe for Dallas Water Utilities. BAR was a subcontractor for a general contractor that was performing a paving contract for Dallas County and this line was installed ahead of the roadwork. The general contractor supplied the steel pipe and BAR installed all the mechanical elements of the project.
Wintergreen Road Intersection Realignment
OWNER
Dallas Water Utilities
ENGINEER
AECOM
COMPLETION DATE
March 2020
AMOUNT
1,325,942 (w/o pipe)