Wintergreen Road Intersection Realignment

273

OWNER
Dallas Water Utilities

ENGINEER
AECOM

COMPLETION DATE
March 2020

AMOUNT
1,325,942 (w/o pipe)

Project Details

This project consisted of the installation of 1,305 LF of 96” steel pipe for Dallas Water Utilities.  BAR was a subcontractor for a general contractor that was performing a paving contract for Dallas County and this line was installed ahead of the roadwork.  The general contractor supplied the steel pipe and BAR installed all the mechanical elements of the project.