Lake Arlington Lift Station

2022-06-24-07-56-09-805

OWNER
City of Fort Worth

ENGINEER
Freese and Nichols, Inc.

COMPLETION DATE
November 15, 2022

AMOUNT
10,076,539

Project Details

This project consists of the construction of a trench-type wet well. It includes (3) 500 HP submersible pumps with variable frequency drives, appurtenances, valves, piping, and protective coatings. Yard piping includes 210 LF of 78” FRP gravity main, 250 LF of 42” DI force main, 240 LF of 30” DI discharge, 560 LF of 24” FRP gravity main and 630 LF of 8” C900 water line. The project also includes a precast electrical building, generator pad, an odor control system, and 8500 square yards of paving.