Reclaimed Water System Pump Station and Treatment Plant Improvements

image012

OWNER
City of Weatherford

ENGINEER
Freese and Nichols, Inc.

COMPLETION DATE
October 11, 2024

AMOUNT
5,572,959

Project Details

The work included one new 3.3 MGD Reclaimed Water System Pump Station (expandable to 5 MGD) with flow meter and site piping to the connection at the reclaimed water pipeline just outside the plant.  Treatment Plant improvements included an independent chemical coagulant addition, creation of anaerobic zones at the old plant with mechanical mixing equipment, conversion of one of the existing decommissioned anaerobic digesters to at waste activate sludge (WAS) holding tank with mechanical mixing and aeration, installation of one mechanical WAS thickener at the existing solids handling building, conversion of the existing gravity thickener to thickened WAS holding tanks with mechanical mixing and aeration, including all electrical and SCADA improvements required.