This project consisted of the buried and exposed piping and above ground facilities that connect the IPL Section 12 pipeline to the existing Cedar Creek and Richland Chambers Pipelines near the south end of Joe Pool Lake. The approximately 1,300 LF of buried and exposed piping range in sizes from 60” to 108”. The exposed piping is housed within a 7,000 SF structural steel framed building with precast concrete wall panels and an overhead bridge crane. The site improvements for this project consists of a precast concrete panel screening wall, and extensive landscaping and irrigation.