NE McKinney Pump Station

Picture2

OWNER
NTMWD

ENGINEER
CDM Smith, Inc.

COMPLETION DATE
July 1, 2027

AMOUNT
57,482,912.46

Project Details

This project is located at 3701 Redbud Blvd, McKinney, Texas 75071. Project includes construction of a new treated water pump station and associated facilities, including the following: flow control station and related facilities; 5-million-gallon wire-wound prestressed concrete tank (AWWA D110) with mixer; precast concrete panel pump station with four vertical turbine can pumps (50 million-gallon per day firm capacity) with plan for future pumps, piping and valves; electrical building including switchgear room, electrical room, SCADA room; HVAC equipment; fire suppression systems including sprinklers and clean agent systems; sump pumps, drains and plumbing fixtures; electrical equipment including transformers, switchgears, adjustable frequency drives (AFDs), motor control centers, site electrical facilities; Supervisory Control and Data Acquisition (SCADA) system including PLC and HMI hardware; discharge meter station and appurtenance, yard piping and valves, civil site work including paving, grading, drainage, domestic water and sanitary sewers, fencing and gates and miscellaneous appurtenances.