This project is located at 3701 Redbud Blvd, McKinney, Texas 75071. Project includes construction of a new treated water pump station and associated facilities, including the following: flow control station and related facilities; 5-million-gallon wire-wound prestressed concrete tank (AWWA D110) with mixer; precast concrete panel pump station with four vertical turbine can pumps (50 million-gallon per day firm capacity) with plan for future pumps, piping and valves; electrical building including switchgear room, electrical room, SCADA room; HVAC equipment; fire suppression systems including sprinklers and clean agent systems; sump pumps, drains and plumbing fixtures; electrical equipment including transformers, switchgears, adjustable frequency drives (AFDs), motor control centers, site electrical facilities; Supervisory Control and Data Acquisition (SCADA) system including PLC and HMI hardware; discharge meter station and appurtenance, yard piping and valves, civil site work including paving, grading, drainage, domestic water and sanitary sewers, fencing and gates and miscellaneous appurtenances.