Trinity River Main Stem Raw Water Pump Station

262 Mainstem

OWNER
North Texas Municipal Water District

ENGINEER
Freese and Nichols

COMPLETION DATE
August 2019

AMOUNT
16,933,400

Project Details

Construction from a green field off the Trinity River included 150,000 CY excavation with 20,000 sf of lagged shoring, installation of a 113,000 vsf trenched bentonite slurry wall, new pump station, forebay, intake box, and sediment lagoon requiring 16,000 cy of concrete, and 95,250 sf of open cell cabled block system as slope protection, with all associated piping, penetrations, paving, miscellaneous metals, fencing, and finishes.