Eagle Mountain Connection Project, Contract A

222

OWNER
Tarrant Regional Water District

ENGINEER
Freese & Nichols

COMPLETION DATE
June 2008

AMOUNT
44,594,012

Project Details

This project consisted of the construction of approximately 55,500 LF of 96” water transmission pipeline and the installation of approximately 1,500 LF of tunnel liner plate through extremely hard limestone rock which required pre-trenching.  It also included the construction of several structures, a flow meter vault, flow control vault, impact basin, baffled chute spillway for the Clear Fork Outlet Structure, the Benbrook Booster Pump Station Flow Control structure with valves, as well as the construction of the BWSA, Weatherford, and Benbrook Pipeline Connections.